All Projects

All Projects

(1)

Hospitality Furniture Development

Managed the full development and execution of loose and built-in furniture — from quotation and prototyping to production tracking and installation — in collaboration with the project’s interior architect.

Hospitality Projects such as: Sereno Residences and short-term stay apartments

for The Blue House

Process Overview

For each short-term stay project, the interior architect defined the design concept and spatial layout. My role focused on translating those ideas into detailed, buildable high traffic solutions through the following process:


  1. Technical Development & Documentation

  • Translated the architect’s interior design concept into precise technical drawings for both loose and built-in furniture that could sustain the repetitive use over time.

  • Developed construction details, material specifications, and measurements to ensure manufacturability and consistency with the overall design intent.


  1. Supplier Coordination & Production Oversight

  • Visited furniture workshops and suppliers to review prototypes and monitor the production process.

  • Identified and resolved technical or aesthetic issues directly with fabricators, ensuring quality and adherence to design standards.


  1. Installation Management

  • Coordinated installation teams to ensure the correct assembly and placement of furniture on site.

  • Managed on-site adjustments and problem-solving during installation, maintaining close alignment with both the design vision and project timelines.

All Projects

(1)

Hospitality Furniture Development

Managed the full development and execution of loose and built-in furniture — from quotation and prototyping to production tracking and installation — in collaboration with the project’s interior architect.

Hospitality Projects such as: Sereno Residences and short-term stay apartments

for The Blue House

Process Overview

For each short-term stay project, the interior architect defined the design concept and spatial layout. My role focused on translating those ideas into detailed, buildable high traffic solutions through the following process:


  1. Technical Development & Documentation

  • Translated the architect’s interior design concept into precise technical drawings for both loose and built-in furniture that could sustain the repetitive use over time.

  • Developed construction details, material specifications, and measurements to ensure manufacturability and consistency with the overall design intent.


  1. Supplier Coordination & Production Oversight

  • Visited furniture workshops and suppliers to review prototypes and monitor the production process.

  • Identified and resolved technical or aesthetic issues directly with fabricators, ensuring quality and adherence to design standards.


  1. Installation Management

  • Coordinated installation teams to ensure the correct assembly and placement of furniture on site.

  • Managed on-site adjustments and problem-solving during installation, maintaining close alignment with both the design vision and project timelines.

Create a free website with Framer, the website builder loved by startups, designers and agencies.